PLT2I-M8

Pan-Ty® locking tie, intermediate cross section, 8.0 (203mm) length, nylon 6.6, gray.

Keep cables securely organized with our Pan-Ty® locking tie in gray. Made from durable nylon 6.6, this intermediate cross section tie measures 8.0 inches (203mm) in length, providing ample room for bundling. With a maximum operating temperature of 185°F (85°C) and a minimum of -60°C (-76°F), it's suitable for a variety of environments, including plenums. The tie has a tensile strength of 177.92 N (40 lb) and can accommodate bundle diameters ranging from .06 inches (1.5mm) to 2 inches (50.8mm). With RoHS compliance, you can trust in the quality and safety of this product for your wire and cable management needs.
AVAILABILITY
Immediate Shipment:NA
Stock Location:In Stock
Factory Stock:Call for Stock
Factory Lead:
Unit Of Measure:
Minimum/Multiple:1/1
Pricing
CALL: 800.422.3911
Invalid quantity value
Product Category:
Manufacturer:Panduit
Manufacturer Part Number:Panduit PLT2I-M8
Color:Gray
Maximum Operating Temperature:85 °C, 185 °F
Minimum Operating Temperature:-60 °C, -76 °F
Overall Width:24 in, 6.1 mm
Overall Length:8 in, 203.2 mm
Material:Nylon 6.6
Maximum Bundle Diameter:2 in, 50.8 mm
Tensile Strength:40 lb, 177.92 N
Environment Application:Plenum
Minimum Bundle Diameter:.06 in, 1.5 mm
SKU:PANPLT2I-M8
Supplier Product:Standard Cable & Wire Ties
Overall Thickness In:0.05 (In.)
Minimum Installation Temperature F:-4 (°F)
Standards Met:CSA Certified, UL Recognized (File #E56854), UL 62275 Compliant (Type 2, 21), RoHS Complaint
Maximum Installation Temperature F:32 (°F)
Minimum Installation Temperature C:-20 (°C)
Overall Thickness mm:1.3 (mm)
For Use With:GTS-E, GS2B-E, PTS

Environmental Initiative Details

Environmental Initiative:RoHS
Compliant:Unknown
Date of this Information:Unknown
Notes:

Product Change Notice

Effective DateDescription of ChangeDownload
11/30/2023PAN-PCN-20230922-1 - Production Location Change. In May 2023, Panduit announced the strategic decision to relocate our manufacturing operations from Tuas in Singapore to Senai in Johor, Malaysia by mid-2024. Relocating these manufacturing operations to Malaysia will allow us to ensure capacity and capabilities that will position us for further growth.
Download