| Attribute | Value |
|---|---|
| Product Category: | |
| Manufacturer: | Molex |
| Manufacturer Part Number: | Molex 55100-0680 |
| Housing Material: | Plastic |
| Number of Contacts: | 6 |
| Termination Method: | Solder |
| Contact Material: | Phosphor Bronze |
| Contact Plating: | Gold |
| Pitch: | 2 mm |
| Shielded: | Yes |
| Current Rating: | 2 A |
| Voltage Rating: | 125 VAC |
| Operating Temperature: | -40 to 85 °C |
| Mounting Angle: | Straight |
| SKU: | MOL55100-0680 |
55100-0680
| ICC Number: | MOL55100-0680 |
| Manufacturer: | Molex |
| Manufacturer Number: | 55100-0680 |
| Datasheet: | Datasheet |
| ECAD Model: |
Description:
2.00mm Pitch Serial I/O Connector, Plug Kit, Wire-to-Wire, Solder Type, 6 Circuits
Specifications
Product Change Notice
| Effective Date | Description of Change | Download | |||
|---|---|---|---|---|---|
| 06/05/2024 | 514331 - Equipment Transfer, Production Transfer or Rearrangement. To better serve our customers and to leverage our global manufacturing footprint, Molex will relocate production of the 2.0 I/O lines from Japan to Molex Vietnam production facility. The transfer will started in Q4 2023 and target to complete in Q2 2024. Buffer stock and capacity tooling will be built as need to ensure a seamless transfer. | Download | |||
| 02/20/2024 | 513778- Equipment Transfer, Production Transfer or Rearrangement. To better serve our customers and to leverage our global manufacturing footprint, Molex will relocate production of the 2.0 I/O lines from Japan to Molex Vietnam production facility. The transfer will started in Q3 2023 and target to complete in Q1 2024. Buffer stock and capacity tooling will be built as need to ensure a seamless transfer. | Download | |||
| 10/30/2023 | 513766 - Equipment Transfer, Production Transfer or Rearrangement. To better serve our customers and to leverage our global manufacturing footprint, Molex will relocate production of the 2.0 I/O lines from Japan to Molex Vietnam production facility. The transfer will started in Q2 2023 and target to complete at the beginning of Q4 2023. Buffer stock and capacity tooling will be built as need to ensure a seamless transfer. | Download | |||

