| Attribute | Value |
|---|---|
| Product Category: | |
| Manufacturer: | Molex |
| Manufacturer Part Number: | Molex 52746-1571 |
| Housing Material: | Nylon |
| Number of Contacts: | 15 |
| Contact Material: | Phosphor Bronze |
| Contact Plating: | Gold |
| Pitch: | 0.5 mm |
| Housing Color: | Natural |
| Contact Orientation: | Bottom |
| Current Rating: | 0.5 A |
| Voltage Rating: | 50 V |
| Mated Stacking Height: | 2 mm |
| Operating Temperature: | -40 to 85 °C |
| Mounting Angle: | Right Angle |
| Mounting Type: | Surface Mount |
| insertion_force_type: | ZIF |
| SKU: | MOL52746-1571 |
52746-1571
Specifications
Detailed Description
Introducing the 52746-1571, a high-performance Easy-On FFC/FPC Connector designed for seamless connectivity in electronic applications. With a slim 0.50mm pitch and Right-Angle, Bottom Contact configuration, this Slider Series connector offers space-saving and efficient cable termination. Featuring 15 Circuits and durable Gold Plating on the contacts, it ensures reliable signal transmission. The Phosphor Bronze contact material with Gold plating guarantees excellent conductivity and corrosion resistance, suitable for a wide range of operating environments. With a low operating temperature of -40 °C and a maximum of 85 °C, this connector is highly versatile. Its compact 2.00mm height and PCB retention capability make it ideal for tight spaces and rugged conditions. RoHS compliant and with a high mating cycle of 20, the 52746-1571 is a dependable solution for your FFC/FPC connection needs.
Product Change Notice
| Effective Date | Description of Change | Download | |||
|---|---|---|---|---|---|
| 02/01/2023 | 512311 - Equipment Transfer, Production Transfer or Rearrangement. Production plant location change Current : Molex Kagoshima, After : Molex Vietnam To better serve our customers and to leverage our global manufacturing footprint, Molex will relocate production of the 0.5FPC 1.9H ZIF RA BTM CT lines from Japan to Molex Vietnam production facility. The transfer will started in Q4 2022 and target to complete in Q1 2023. Buffer stock and capacity tooling will be built as need to ensure a seamless transfer. | Download | |||

