| Attribute | Value |
|---|---|
| Product Category: | |
| Manufacturer: | Molex |
| Manufacturer Part Number: | Molex 500654-0619 |
| Housing Material: | Plastic |
| Number of Contacts: | 6 |
| Contact Material: | Stainless Steel |
| Pitch: | 2 mm |
| Shielded: | Yes |
| Current Rating: | 1.5 A |
| Voltage Rating: | 125 V |
| Operating Temperature: | -40 to 85 °C |
| Mounting Angle: | Straight |
| Mounting Type: | Wire Mount |
| SKU: | MOL500654-0619 |
500654-0619
Specifications
Detailed Description
Introducing the 500654-0619, a high-speed wire-to-wire connector designed for seamless data transmission in demanding environments. With a low amperage of 1.5 A and a voltage rating of 125 V, this connector ensures efficient power delivery without compromising on safety. Featuring six stainless steel contacts, it guarantees reliable signal integrity, while its polycarbonate and polyester construction offers robust protection. The black and gray color scheme, along with a vertical orientation, allows for easy integration into any system. Each connector is loaded with six contacts and is shielded for optimal performance. With a pitch of 2 mm and compatibility with 24-28 AWG wire sizes, it provides versatility in installation. RoHS non-compliant.
Product Change Notice
| Effective Date | Description of Change | Download | |||
|---|---|---|---|---|---|
| 02/20/2024 | 513778- Equipment Transfer, Production Transfer or Rearrangement. To better serve our customers and to leverage our global manufacturing footprint, Molex will relocate production of the 2.0 I/O lines from Japan to Molex Vietnam production facility. The transfer will started in Q3 2023 and target to complete in Q1 2024. Buffer stock and capacity tooling will be built as need to ensure a seamless transfer. | Download | |||
| 10/30/2023 | 513766 - Equipment Transfer, Production Transfer or Rearrangement. To better serve our customers and to leverage our global manufacturing footprint, Molex will relocate production of the 2.0 I/O lines from Japan to Molex Vietnam production facility. The transfer will started in Q2 2023 and target to complete at the beginning of Q4 2023. Buffer stock and capacity tooling will be built as need to ensure a seamless transfer. | Download | |||

