| 08/21/2026 | 517851 - Change Supplier. validate and add an alternative hot melt resin to the one we currently use in the molding process copper solutions. | Download |
| 02/26/2025 | 515592 - Equipment Transfer, Production Transfer or Rearrangement. This notification is to inform you that the listed PNs will add DG2/DG3 as alternative production site. No changes will be made to product as part of this change. Details can refer to below contents.
| Download |
| 02/21/2025 | 515831 - Packaging Method/Quantity Changing. New information is added to the QR tag in document shett three 1002970001_GDL rev F PK. The bag tag in 002970001_GDL rev F PK will be removed because the bag tag information will be on the QR tag and the cable tag.
| Download |
| 03/15/2022 | 510530 - Change Supplier. Molex QSP Latch vendor is changing its raw material supplier. the material will remain Stainless Steel (full hard), however the location of the supplier will be different.
| Download |
| 12/02/2016 | 500886 - Change to Product. This letter is to inform you that changes are being made to the part(s) identified in this Notice. The change will affect the fit, form, function or appearance of the parts. Or, it may result in a change to the specification. | Download |