0679L9100-05
2410 SMT Fuse, Quick Acting, 10A
The 0679L9100-05, a high-performance surface mount fuse designed for reliable circuit protection. With a fast blow response time, this fuse quickly cuts off power in the event of overcurrents, safeguarding your electronic devices from potential damage. Rated for 10A at both 125VAC and 125VDC, it offers robust protection for a wide range of applications. The compact 2410 case size makes it easy to integrate into your circuit board layout. Please note that this product is not RoHS compliant. Trust in the 0679L series for efficient and dependable fuse protection.
Product Category: | |
Manufacturer: | Bel Fuse Inc. |
Manufacturer Part Number: | Bel Fuse Inc. 0679L9100-05 |
Series: | 0679L |
Mount Type: | Surface Mount |
Response Time: | Fast Blow |
Fuse Type: | Surface Mount |
Case Size: | 2410 |
Current Rating: | 10 A |
Voltage Rating (AC): | 125 VAC |
Voltage Rating (DC): | 125 VDC |
SKU: | BEF0679L9100-05 |
Environmental Initiative Details
Environmental Initiative: | RoHS |
---|---|
Compliant: | Unknown |
Date of this Information: | Unknown |
Notes: |
Product Change Notice
Effective Date | Description of Change | Download |
---|---|---|
05/01/2025 | PCN-F250002 - Assembly Location Transfer. The manufacturing location of brick fuses will be relocating to a larger manufacturing facility in Shenzhen, Guangdong Province. There is no change in the country of origin (COO). Shipment may contain products manufactured from existing and new manufacturing sites starting from 1 May 2025 until the inventory from existing manufacturing site is fully depleted. | Download |
03/31/2025 | PCN F2400014 - Production Transfer.As part of the continuous optimization of our global production in terms of suitable products/product technology, we have determined to transfer production within China. It is necessary to expand production into another facility to secure additional capacity and support future growth. The new manufacturing location is ISO 9001 certified. The product transfer will begin in January with the target of being able to produce the first products during February 2025. Timing varies by products, with initial mass production in Q2, 2025. | Download |