The FASTON 250 TAB .032 TPBR, a versatile through-hole termination solution for your connectivity needs. With a straight orientation and stud mount design, this terminal offers easy installation and reliable performance. Crafted for durability, it is RoHS compliant and features a 45° terminal angle for efficient connection. Ideal for use in HVAC systems and various other applications, the 140814-2 is a must-have component for your projects. With its high-quality construction and convenience of stock availability, this terminal ensures seamless connectivity in any environment. Upgrade your system with this essential component and experience efficient and secure terminal connections like never before.
AVAILABILITY
Immediate Shipment:NA
Stock Location:In Stock
Factory Stock:Call for Stock
Factory Lead:
Unit Of Measure:
Minimum/Multiple:1/1
Pricing
CALL: 800.422.3911
Invalid quantity value
Product Category:
Manufacturer:TE Connectivity
Manufacturer Part Number:TE Connectivity 140814-2
Termination Method:Through Hole
Terminal Type:Tab
Orientation:Straight
Mounting Style:Stud Mount
Product:PCB Terminals
Terminal Angle:45°
SKU:AMP140814-2
series:FASTON 250
Plating Material:Tin
Stud Hole:Yes
Terminal Type:Tab
Terminal Size:6.35
Underplating Material:Brass
Mating Tab Width:6.35 mm / .25 in
Mating Tab Thickness:.81 mm / .032 in
Receptacle Terminal Stock Thickness:.81 mm / .032 in
Stud Diameter:4.1 mm / .161 in
Terminates To:Printed Circuit Board
Operating Temperature Range:-30 - 110 °C / -22 - 230 °F

Environmental Initiative Details

Environmental Initiative:RoHS
Compliant:Unknown
Date of this Information:Unknown
Notes:

Product Change Notice

Effective DateDescription of ChangeDownload
10/03/2022PCN-22-148631 - Manufacturing locations added. The listed PNs will be produced in China (under TE Qingdao control) to improve supply chain and reduce delivery. we hereby inform you that listed PNs will be produced in China (under TE Qingdao Plant control). The new manufacturing location is under a certified quality management system according to the standard industry requirements. This is done to improve supply chain, reduce backlog and delivery of involved parts: we plan to have production starting from October 2022. An internal release based on our specifications will be executed before any parts will be delivered, which guarantees the performance.Download