| Attribute | Value |
|---|---|
| Product Category: | |
| Manufacturer: | TE Connectivity |
| Manufacturer Part Number: | TE Connectivity 1241608-6 |
| Amperage: | 7.5 A |
| Termination Method: | Crimp |
| Operating Temperature Range: | -40 - 130 °C, -40 - 266 °F |
| Wire Size: | .75 - 1.5 mm² |
| Crimp Type: | F-Crimp |
| Terminal Primary Locking Feature: | Clean Body |
| Terminal / Splice Type: | Receptacle |
| Product: | Automotive, Truck, Bus, & Off-Road Terminals |
| SKU: | AMP1241608-6 |
1241608-6
Specifications
Detailed Description
1241608-6 - Introducing the MQS1,5 Ag rec CB unseal terminal, a high-performance solution for automotive, truck, bus, and off-road applications. With an amperage rating of 7.5 A, this terminal is designed for reliable power transmission. Featuring a crimp termination method and operating efficiently in a wide temperature range from -40 to 130 °C (-40 to 266 °F), it ensures secure connections even in harsh environments. The .75-1.5 mm² wire size and F-Crimp type offer versatility and ease of installation. Engineered with a Clean Body primary locking feature and a receptacle splice type, this terminal guarantees enhanced safety and stability. RoHS compliant and meticulously crafted, it is a dependable choice for your automotive connectivity needs.
Application Tooling
| Product | Part # | Description | Stock |
|---|---|---|---|
| TE Connectivity 1-1579018-4 | TE Connectivity 1241608-6 Application Tooling | ![]() |
| TE Connectivity 2151066-1 | TE Connectivity 1241608-6 Application Tooling | ![]() |
| TE Connectivity 2151066-2 | TE Connectivity 1241608-6 Application Tooling | ![]() |
| TE Connectivity 6-1579007-0 | TE Connectivity 1241608-6 Application Tooling | ![]() |
| TE Connectivity 7-2151066-7 | TE Connectivity 1241608-6 Application Tooling | ![]() |
| TE Connectivity 2305570-1 | TE Connectivity 1241608-6 Application Tooling | ![]() |
Product Change Notice
| Effective Date | Description of Change | Download | |||
|---|---|---|---|---|---|
| 02/20/2024 | P-23-025380 - MOQ & DU Change. To inform you about a change in delivery unit & minimum order quantity (MOQ) impacting PNs listed below in this PCN. Change was already communicated via P-23-024531 but new PCN informs about postponed activation date: As of February 20, 2024 we will increase the delivery unit & the min. order quantity according to attached file. The order quantity should therefore be not less than the MOQ and should be dividable through the MOQ. Dimensions and material of product and shipping box will stay the same. The change has no impact to form-fit-function. TE Change process follows a strict procedure, which fully maintains quality and ability to supply. The product in scope of this PCN is TE general sales / catalogue product, therefore TE reserves the right to determine delivery unit & MOQ. No PPAP will be submitted for this PCN. It is kindly requested to adjust order quantities before the activation on February 20, 2024 to avoid blocked orders. | Download | |||
| 02/20/2024 | P-23-025381 - MOQ & DU Change. To inform you about a change in delivery unit & minimum order quantity (MOQ) impacting PNs listed below in this PCN. Change was already communicated via P-23-024531 but new PCN informs about postponed activation date: As of February 20, 2024 we will increase the delivery unit & the min. order quantity according to attached file. The order quantity should therefore be not less than the MOQ and should be dividable through the MOQ. Dimensions and material of product and shipping box will stay the same. The change has no impact to form-fit-function. TE Change process follows a strict procedure, which fully maintains quality and ability to supply. The product in scope of this PCN is TE general sales / catalogue product, therefore TE reserves the right to determine delivery unit & MOQ. No PPAP will be submitted for this PCN. It is kindly requested to adjust order quantities before the activation on February 20, 2024 to avoid blocked orders. | Download | |||
| 07/20/2023 | P-23-024531 - Change to DU & MOQ. change in delivery unit & minimum order quantity (MOQ) impacting PNs listed below in this PCN. As of July 20, 2023 we will increase the delivery unit & the minimum order quantity according to attached file. The order quantity should therefore be not less than the MOQ and should be dividable through the MOQ. Dimensions and material of product and shipping box will stay the same. The change has no impact to form-fit-function. TE Change process follows a strict procedure, which fully maintains quality and ability to supply. No PPAP will be submitted for this PCN. | Download | |||


